This assignment is to create a new mobility network for the zone of Penha circular in Rio de Jenerio.

This is an important perinode with highways, bus stops and metro line.

The metro track created a barrier among the northern and the southern parts of the zone.

20 important places were identified and marked on the zone to create a new mobility network.
Optimization of the distance between the identified points.

New optimized and maximized mobility network.
Tutors: Rodrigo Aguirre, Aldo Sollazzo
Student: Prateek Bajpai